10.Ref cabinet installation instructions.

1 Preparation of the ref cabinet.

Temporally fix some scrap material to the top

of the ref cabinet so that they overhang the

sides. Make sure that you can remove these

later after it is in position. If you cannot

remove the material you will need to fix this

from inside the cabinet.

Tip, Position your screws approximately

50mm from the front and 25mm off the back

to the inside of the cabinet this way if you are

using the bulk head frame you can use the

same screw holes.

2 Positioning of the top cabinet.

Place the top cabinet into position against

adjoining panel, clamp & fix into position

allowing the door thickness margin. This will

give you the position for the other panel.

Tip, You can use two scrap pieces of material

joined together to temporarily prop the

cabinet level whilst you fit the other panel.

3 Fitting the side panel.

Scribe to floor and wall the side panel, then fix

into position as per the panel installation

instructions making sure that you keep the

panel plumb and parallel to the other panel.

Tips, You can fix the side panel to the wall &

floor by simply bedding the panel onto a bead

of construction glue on the floor and wall as

you install the panel.